Home Sports Aston Martin trusts in his operation: “The wind tunnel really gives us...

Aston Martin trusts in his operation: “The wind tunnel really gives us great data.”

9
0

R.The rust of the process`–Confia in the process- Watch the phrase one thousand times in sports. It is a belief in continuous and methodological work to lead to a goal, which is something Aston Martin also participates. The beginning of the 2025 campaign in Formula 1 is different flavors: that good that must be seen bayonet picnic In points, the evil results that did not arrive Fernando Alonso And unknown a Amr25 This is not completely exciting. But it is also 2026 on the horizonWith a new organization and influence of Adrian Newy.

Aston Martin Martin Fernando Alonso driver from Spain sit in his car during the enemy race before the Chinese race one in the International Chamber of Shanghai, Shanghai, on Saturday, March 22, 2025 (Wu Hau/Potor, a photo via AP)

practical Aston Martin is something that Ben Fitzgerald, Head of Operations (CO) for the British team. He is one of those who trust the future of the British. With the main appearance: the new wind tunnel on the technological campus in Silverstone. It is the latest grill, much more than that used, for example, Red Ball or Ferrari’s Sadri in Maranilo. “We have to improve it and take some time, however We already use it and give us great data. It is an important step for the team. ”

It opens the developments a lot. “Now we can use the tunnel as we want our position in the tournament. We are used to using Mercedes Fitzgerald added, and we can only work on our programs between Friday and Sunday.

Aston Martin wind tunnel.Aston Martin

They do not hide it. “This year we are developing future programs much more than they were in the past,” he said. “The dynamic decisions of the 2026 car are sent and Within eight or 10 weeks, we can get more solid concepts. We are already producing the concept of the structure, and We will continue to improve. He said

This year we develop much more future programs than in the past

Bin Fitzgerald

2025 …

Although it generates an issue. What progress will be there in 2025? It will exist, under the trial of the team. He said: “The dynamic team works in 2025 and 2026. In terms of engineering, the main goal is the first update of Amr25.” They will continue to work in this campaign.

The dynamic team works in 2025 and 2026. In terms of engineering, the main goal is the first update of Amr25

Bin Verham

And set a major date for the future: Barcelona. “We will have a new technical guidance about the elasticity of pounds and we have to produce a design that adheres to the brand. We must also have the inventory needed for that piece. ” Fitzgerald.



Source link