Home Technology The most important Roman church in Salamanca, which suffers from cars and...

The most important Roman church in Salamanca, which suffers from cars and buildings

9
0

Sunday, 23 March, 2025, 18:38

The damage to the heritage vehicles is not exclusive to the brackets of Plaza mayor, although they take one of the worst parts. However, the truck crossing for loading and unloading has also damaged a Roman jewel, the Saint Martin Church, which offers Rosons in one of its most distinctive elements, her dressing room.

The Saint Martin Church, the “Third Cathedral” of Salsanda, is linked to the oldest senior economic officials and is one of the most valuable examples of the Roman style in the city. Specifically for this reason, its history shows the damage that he did not care about it.

The last of which is the Rozons offered by the dressing room that Plaza Del Corrillo, one of the most invasive places for tourist companies in the city, has suffered from a large vehicle traffic in the download and unloading hours to provide institutions in the region, by 90 % of tourism.

According to the Citizens Association to defend heritage, the Renaissance wearing room with Roson appeared from a heavy vehicle that approached traffic. This is the same that happened a few weeks ago in one of the brackets of the mayor of Plaza Matthew A truck has been included When leaving in the opposite direction to the permitted. The result was another red in the bow and damage to the support base. It must be added to the garbage truck Carvajal College interface was damaged When returning.

It was built in the twelfth century, its main special is that it is practically invisible and that it appears more than its shackles, one Roman, and another renaissance, and a dressing room. It is almost entirely surrounded by buildings that, in turn, are also protected, a pressure that has caused no problems in recent years. Every time there is some intervention, the temple suffers.

Since the beginning of its construction, she had problems with stability that lasted about 700 years to solve it. In fact, the church was in the red list of heritage at the danger of Hasbism Nostra, one of the few huge elements in the province that left the warning level to enter the green list. He did this after a procedure consisting of wiping the entire building.

His last adventure was the emergence of an opinion poll in the church church, which was practically hidden by the buildings that give it to Plaza Del Poeta Iglesias. There is an intervention in one of them, the number 22, which protects many of those around him and has been rehabilitated in a project that took more than four years.

This feature is one of the nine protected in the catalog of the capital’s antiquities, and literally contains the San Martin Church. What is happening to them ends with the effect on the temple and this is what happened this time: the delay in justifying the conclusion has led to the delay in the license of use of the property, which is transferred to the tourist apartments.

The Church, the second work of the romance in the capital after the Vega Cathedral, is completely surrounded by all its parts by buildings that have a kind of protection, which force a great caution in procedures because they all rose between the eighteenth century and the beginning of the twentieth century. They are different patterns and architects such as Santiago Madrocalc or Carlos, but also that any intervention affects the little that is already seen by the Church.

In many cases, the shape of the nine buildings surrounding San Martín includes indicators on the visual images they provide, as evidence of future procedures. This happened with the poet Iglesias, 22, where it was already planned to remove the body on the cornice line and this is what was done. Its new composition improves the opinions of the elements of the Saint Martin Church, which managed to look at imprisonment and abandon it at a few points, along with its arrival and the dressing room in the Plaza del Corllo.

Restoration

The building was subjected to deep intervention for years and ended in 2022. In the successive stages, it was achieved, on the one hand, to correct the structural problems of the building on the other side, enable the exhibition road, and finally, format inside the temple. The primary goal, as a result of the construction itself and the various amendments throughout its history, were the primary goal.

Along with the same intervention, to know the real state of the building, the temple was combined into the monitoring system (MHS), which was developed by the real Santa Maria La Foundation, and the temperature and humidity sensors were installed at very specific points of the building. In parallel, structural movements were monitored, fixed and dynamic, by installing the acceleration scale and correal measurement in the northern and southern walls. The joint analysis of all these variables allowed us to understand the development of the process of decomposition, and to determine their causes, and most importantly, the most successful solution suggests all diseases.



Source link